Published Rates · Updated July 2026 · Statewide Arkansas

Arkansas dirt work prices —
the 2026 rate sheet.

Nobody in this trade publishes prices. Most outfits make you call three contractors just to learn what a dozer costs. We put every rate we run on this one page — dozers, excavators, hauling, aggregate, clearing and ponds — and we keep it current. This is the page other sites end up linking to, because nobody else does this.

Rates IncludeOperator + fuel · working rate
Minimum8 hours on hourly work
MobilizationPriced up front by distance
Page UpdatedJuly 2026 · confirm by phone

Why nobody does this

"Call for a quote"
protects the contractor.

Most dirt-work outfits keep every price off the website on purpose. It isn't an oversight — it's strategy. A blank price page keeps competitors guessing, keeps a salesman between you and the number, and leaves room to charge two customers two different prices for the same job. That's normal in this trade. It's just not how we run ours.

Every hourly rate we run — every dozer, every excavator, every support machine — is published below. So is what our aggregate loads start at, what land clearing starts at per acre, and what a pond starts at. If a rate moves, we update the page. If your job needs more than a rate sheet can tell you, we say so on the phone and send someone to walk the ground for a firm written number, free.

Fifty-plus years under the same family name is what lets us talk straight before it's cost you anything. Three generations of Coxes still answer this phone — 501-250-4490.

Every published rate — operator included

Every machine we run,
every rate we charge.

We run Komatsu dozers and Kobelco excavators — the Cat class beside each machine tells you exactly what size iron shows up. All hourly rates carry the 8-hour minimum; mobilization is quoted up front by distance from Heber Springs.

Dozers — clearing, grading, ripping, pads. GPS machine control on the intelligent units.
DozerSize classBest forRate
Komatsu D51 ≈ Cat D4 class13 ton · 131 hpFinish grading, pads, driveways — GPS blade$165/hr
Komatsu D61 ≈ Cat D5 class17 ton · 168 hpGrading, clearing, pond shaping$190/hr
Komatsu D65 ≈ Cat D6 class20 ton · 217 hpMass grading, heavy clearing, winch work$240/hr
Komatsu D155 ≈ Cat D8 class39 ton · 354 hpBig clearing, ripping, production dirt$340/hr
Excavators — trench, culverts, ponds, mass excavation. The SK330 carries the rock hammer.
ExcavatorSize classBest forRate
Kobelco SK85 ≈ Cat 308 class8.5 ton midiTight residential, utility repairs, small ponds$160/hr
Kobelco SK210 ≈ Cat 320 class21 tonTrenching, culverts, pond digging, pads$240/hr
Kobelco SK330 ≈ Cat 330/336 class33 tonMass excavation, big ponds, heavy lifts$300/hr
SK330 + 10,000-lb hammer rock breaking80,000-lb rigRock that stops everything else — no blasting$425/hr
Support fleet & hauling — the affordable answer for small jobs and by-the-hour trucking.
MachineSize classBest forRate
Cat 306 mini excavator6 tonTight spots, utility repairs, small digs$140/hr
Case backhoe ≈ Cat 420 classLoader-backhoeUtility repairs, small digs, loading$140/hr
Skid steerCompactGrading, cleanup, material moving$140/hr
Volvo L30 loader ≈ Cat 906 classCompact wheel loaderLoading, backfill, driveway gravel work$140/hr
Tri-axle dump truckOn-road haulingAggregate, spoil and debris hauling by the hour$130/hr
By the job — priced by the load, the acre, or the job, not the hour. Full write-ups linked below.
ServiceWhat moves itStarting price
Aggregate loads tri-axle deliveryMaterial + hauling included within 30 miles of Heber Springs; mileage beyond that, volume discounts on bigger orders$400/load
Land clearing statewideDistance from Heber Springs and how big/thick the timber is$5,000/acre
Pond construction dirt work onlySize, depth, clay on site, rock, access — clearing is extra$10,000

Hourly rates: operator + fuel included · 8-hour minimum · mobilization quoted up front by distance from Heber Springs. By-the-job prices are starting points, not firm quotes. All rates current as of July 2026 · prices subject to change without notice.

Priced by the job, not off a rate card

Pads, driveways, trenching, demo —
here's what moves the number.

CSI 31 22 00

Building Pads & Site Prep

Priced after a site walk, not off a phone call. What moves it: how much cut and fill has to balance, how far fill has to be hauled in if the site needs it, whether we hit rock, and how hard the site is to get equipment onto. Support machines run from $140/hr. Full write-up →

CSI 32 11 00

Gravel Driveways & Roads

Mostly rock, and rock is sold by the load — loads start at $400, material and hauling within 30 miles. From there it's length, width, how much rock the base needs, and access. A residential drive usually runs a one- to two-day job; a re-rock is often a single day. Full write-up →

Demolition

Demolition & Cleanup

No flat price — it's the structure and the haul-off. Excavators run $160–$300/hr, support machines from $140/hr, the hammer for concrete $425/hr. A shed teardown is often a one-day, one-machine job; a house is bigger money and more haul-off. Full write-up →

Get a firm number for your job

Talk to a Cox
about your ground.

Call the shop — a Cox answers501.250.4490
Shop50 Fort Cox Rd, Heber Springs, AR 72543
ServingAll of Arkansas — mobilization quoted by distance
Best first stepText photos of the site + which rate on this page looks closest to your job

Get a firm number

Step 1 of 3 — what kind of job is it?

Where & when

Step 2 of 3 — distance sets mobilization, so be specific.

Timeline

Who do we call back?

Step 3 of 3 — we'll call you back with a real number.

Request sent.

We got it and we'll call you back. In a hurry?

Call now: 501-250-4490

Pricing questions, straight answers

What folks ask
about these prices.

Why do you publish prices when nobody else in this trade does?

Because "call for a quote" mostly protects the contractor, not the customer — it keeps competitors guessing and keeps you on the phone before you can compare. We've got fifty-plus years of the same family name on the gate, so we don't need to hide behind a phone call to earn your business. Every rate we run is on this page, and we update it when a rate changes.

What's the 8-hour minimum about?

Loading, hauling, unloading, working, and hauling home makes a short job cost nearly the same as a full day — the minimum keeps the published rates honest instead of padded. For small jobs, the support fleet ($140/hr) keeps small work affordable without paying big-iron rates.

What's NOT included in these prices?

Mobilization beyond what's quoted — getting the machine to your site is priced up front by distance once we know where you are. Rock surprises mid-job get talked through on the site walk, not buried in a change order — that's what the hammer rate is for. And permits, if your project needs any, are the owner's responsibility unless we've agreed otherwise.

Are these prices firm quotes?

No — they're honest starting points, the real numbers we run every day. Your job gets a firm written number after a free site walk, once we've seen the ground, the access, and what's actually involved.

Do these prices change?

Yes. Fuel, steel, insurance and iron all move, and so do we. This page is dated — updated July 2026 — and every rate on it is subject to change without notice. Call 501-250-4490 to confirm current numbers before you budget off an old printout.

Who are you?

Larry Cox started the company in 1972, moving dirt in Cleburne County under his own name. More than fifty years later it's still his name on the license, with Connie, Matthew and Lance Cox running the office, the estimates and the crews today — three generations, same phone number, same standard.

Call the shop Text us a site photo